10 Best Practices for Network Resilience

  • 1 Conduct a Comprehensive Risk Assessment: Evaluate vulnerable physical assets including exposed antenna towers, low-lying substations, and critical remote terminal units (RTUs).
  • 2 Deploy Industrial Wireless Modems: Traditional wired telephone lines and copper cables often break during flooding or high winds. Weatherized wireless modems ensure reliable links when wired lines fail.
  • 3 Establish Redundant Paths: Dual-band or hybrid topologies ensure data automatically reroutes if a primary tower or frequency experiences interference.
  • 4 Leverage Cloud SCADA Monitoring: Secure remote data logging allows field engineers to monitor water levels, line pressure, and power distribution from off-site emergency centers.
  • 5 Ensure Backup Power (UPS & Generators): Modems and telemetry nodes must remain powered during grid blackouts to maintain continuous data flow.
  • 6 Pre-Position Emergency Deployment Kits: Keep pre-configured backup modems, directional antennas, and power supplies ready for rapid field replacement.
  • 7 Collaborate with Regional Utilities: Establish mutual-aid hardware agreements and emergency contact protocols with neighboring municipalities.
  • 8 Conduct Pre-Storm System Drills: Test secondary failover systems and battery backup runtime before severe weather hits.
  • 9 Perform Physical Inspections & Install Surge Protection: Inspect antenna guy-wires, check line-of-sight clearance, and install heavy-duty inline lightning arrestors to protect sensitive radio electronics.
  • 10 Establish a Phased Post-Storm Recovery Plan: Prioritize restoring telemetry to life-safety infrastructure first, such as main water lift stations and sub-station breakers.

Pro Tip: Electrical Noise & Lightning Protection

Modems are typically the most electrically sensitive components in a wireless SCADA network. Charge buildup during electrical storms can destroy ungrounded radio modules. Installing a quality inline lightning arrestor between the antenna coax and the modem is essential for preventing catastrophic storm damage.